Constructions near Junction at Hobson St
2025-07-05
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPAll ramps and access to Murphy Rd are closed due to the NB lanes being shifted to the SB side.
All ramps and access to Murphy Rd are closed due to the NB lanes being shifted to the SB side.
Start Time: 2025-04-16T09:06:15.000-04:00
End Time: 2025-08-31T17:00:00.000-04:00
map local traffic - MAPAll ramps and access to Murphy Rd are closed due to the NB lanes being shifted to the SB side.
All ramps and access to Murphy Rd are closed due to the NB lanes being shifted to the SB side.
Start Time: 2022-11-04T00:00:00.000-04:00
End Time: 2025-08-31T17:00:00.000-04:00
map local traffic - MAPRoadwork on Rosehill Rd from Tamarack Dr to Dowfield Dr.
Roadwork on Rosehill Rd from Tamarack Dr to Dowfield Dr.
Start Time: 2025-06-20T23:50:00.000-04:00
End Time: 2025-06-21T08:15:51.797-04:00
map local traffic - MAPRoadwork on Rosehill Rd from Dowfield Dr to Tamarack Dr.
Roadwork on Rosehill Rd from Dowfield Dr to Tamarack Dr.
Start Time: 2025-06-20T22:54:32.000-04:00
End Time: 2025-06-21T08:15:51.797-04:00
map local traffic - MAPThe exit and entrance ramp to and from Murphy Rd is closed.
The exit and entrance ramp to and from Murphy Rd is closed.
Start Time: 2025-06-20T13:49:15.000-04:00
End Time: 2025-08-31T17:00:00.000-04:00
map local traffic - MAPCulvert replacement
Culvert replacement
Start Time: 2025-04-14T10:59:00.000-04:00
End Time: 2025-12-10T08:00:00.000-05:00
map local traffic - MAPCulvert replacement
Culvert replacement
Start Time: 2025-04-14T10:58:00.000-04:00
End Time: 2025-12-10T08:00:00.000-05:00
map local traffic - MAPAs part of the I-295 construction, the access to the neighborhood located on Braddy Rd (SR 1111) on the north side of Stoney Point Rd (SR 1112) will be cut off until the bridge on Stoney Point Rd is constructed. Braddy Rd was extended on the north side of the neighborhood and a new access point has been created for the neighborhood off of Grimes Rd (SR 1110) approximately 2,000 feet (0.38 miles) north of the Stoney Point Rd/Grimes Rd intersection.
As part of the I-295 construction, the access to the neighborhood located on Braddy Rd (SR 1111) on the north side of Stoney Point Rd (SR 1112) will be cut off until the bridge on Stoney Point Rd is constructed. Braddy Rd was extended on the north side of the neighborhood and a new access point has been created for the neighborhood off of Grimes Rd (SR 1110) approximately 2,000 feet (0.38 miles) north of the Stoney Point Rd/Grimes Rd intersection.
Start Time: 2024-04-25T09:55:00.000-04:00
End Time: 2025-08-01T17:00:00.000-04:00
map local traffic