    The Contractor will have both directions of US 29 closed from I-74 to Surrett Dr from Friday at 9:00 PM to Monday at 6:00 AM with a signed detour route to allow construction crews to place the Southbound traffic into a single lane in the Northbound lanes. Contractor will also place the Northbound traffic into a single lane. This work is necessary to allow the contractor to complete the work required on US 29 and the on Ramp from Main St to US 29 Southbound.
    The Contractor will have both directions of US 29 closed from I-74 to Surrett Dr from Friday at 9:00 PM to Monday at 6:00 AM with a signed detour route to allow construction crews to place the Southbound traffic into a single lane in the Northbound lanes. Contractor will also place the Northbound traffic into a single lane. This work is necessary to allow the contractor to complete the work required on US 29 and the on Ramp from Main St to US 29 Southbound.
    Start Time: 2025-06-20T21:18:02.000-04:00
    End Time: 2025-06-23T06:00:00.000-04:00