Constructions near Junction at Hillside Dr
2025-07-09
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork on Blue Ridge Pkwy from US-421/US-221 (Blue Ridge Pkwy) to US-421 (Blue Ridge Pkwy).
Roadwork on Blue Ridge Pkwy from US-421/US-221 (Blue Ridge Pkwy) to US-421 (Blue Ridge Pkwy).
Start Time: 2025-06-20T21:38:30.000-04:00
End Time: 2025-06-21T08:14:10.172-04:00
map local traffic - MAPJames R. Vannoy & Sons Construction Company Inc. is progressing on the secondary road improvements on SR 1541 (Pyane Branch Road) in Blowing Rock, North Carolina. The project is part of an ongoing effort to enhance local infrastructure and improve road safety for area residents. The scope of work includes grading and widening the existing roadway to accommodate two travel lanes, installation of new drainage systems, guardrails, retaining wall, and paving the road surface. During the construction period, motorists may experience extended wait times and delays. Residents and visitors are advised that only local traffic should use SR 1541 during this time.
James R. Vannoy & Sons Construction Company Inc. is progressing on the secondary road improvements on SR 1541 (Pyane Branch Road) in Blowing Rock, North Carolina. The project is part of an ongoing effort to enhance local infrastructure and improve road safety for area residents. The scope of work includes grading and widening the existing roadway to accommodate two travel lanes, installation of new drainage systems, guardrails, retaining wall, and paving the road surface. During the construction period, motorists may experience extended wait times and delays. Residents and visitors are advised that only local traffic should use SR 1541 during this time.
Start Time: 2025-06-12T08:36:00.000-04:00
End Time: 2027-03-25T09:08:00.000-04:00
map local traffic - MAPJames R. Vannoy & Sons Construction Company Inc. is progressing on the secondary road improvements on SR 1541 (Pyane Branch Road) in Blowing Rock, North Carolina. The project is part of an ongoing effort to enhance local infrastructure and improve road safety for area residents. The scope of work includes grading and widening the existing roadway to accommodate two travel lanes, installation of new drainage systems, guardrails, retaining wall, and paving the road surface. During the construction period, motorists may experience extended wait times and delays. Residents and visitors are advised that only local traffic should use SR 1541 during this time.
James R. Vannoy & Sons Construction Company Inc. is progressing on the secondary road improvements on SR 1541 (Pyane Branch Road) in Blowing Rock, North Carolina. The project is part of an ongoing effort to enhance local infrastructure and improve road safety for area residents. The scope of work includes grading and widening the existing roadway to accommodate two travel lanes, installation of new drainage systems, guardrails, retaining wall, and paving the road surface. During the construction period, motorists may experience extended wait times and delays. Residents and visitors are advised that only local traffic should use SR 1541 during this time.
Start Time: 2025-06-12T08:36:00.000-04:00
End Time: 2027-03-25T09:08:00.000-04:00
map local traffic - MAPParkway areas closed for ongoing road maintenance, construction, Helene recovery projects and impacted areas.
Parkway areas closed for ongoing road maintenance, construction, Helene recovery projects and impacted areas.
Start Time: 2025-05-08T14:12:44.000-04:00
End Time: 2025-12-31T09:43:00.000-05:00
map local traffic - MAP. Bridge # 940187 is damaged and closed at the intersection of Meat Camp Rd.
. Bridge # 940187 is damaged and closed at the intersection of Meat Camp Rd.
Start Time: 2024-10-03T11:23:00.000-04:00
End Time: 2026-05-30T12:00:00.000-04:00
map local traffic - MAP. Bridge # 940187 is damaged and closed at the intersection of Meat Camp Rd.
. Bridge # 940187 is damaged and closed at the intersection of Meat Camp Rd.
Start Time: 2024-10-03T11:23:00.000-04:00
End Time: 2026-05-30T12:00:00.000-04:00
map local traffic - MAPParkway areas closed for ongoing road maintenance, construction, Helene recovery projects and impacted areas.
Parkway areas closed for ongoing road maintenance, construction, Helene recovery projects and impacted areas.
Start Time: 2024-09-25T16:10:28.000-04:00
End Time: 2025-12-31T09:43:00.000-05:00
map local traffic - MAPParkway areas closed for ongoing road maintenance, construction, Helene recovery projects and impacted areas.
Parkway areas closed for ongoing road maintenance, construction, Helene recovery projects and impacted areas.
Start Time: 2024-09-25T15:56:33.000-04:00
End Time: 2025-12-31T09:43:00.000-05:00
map local traffic - MAPRoadwork on NC-105 / NC Highway 105 S from Shulls Mill Rd (NC-105) to NC-105 Byp (NC-105).
Roadwork on NC-105 / NC Highway 105 S from Shulls Mill Rd (NC-105) to NC-105 Byp (NC-105).
Start Time: 2025-06-20T10:35:15.000-04:00
End Time: 2025-06-21T08:14:10.172-04:00
map local traffic - MAPLandslide causing loss of original roadway; site under construction with narrowed lanes from Autumn View Dr to State View Rd.
Landslide causing loss of original roadway; site under construction with narrowed lanes from Autumn View Dr to State View Rd.
Start Time: 2025-06-08T09:42:30.000-04:00
End Time: 2025-07-31T12:00:00.000-04:00
map local traffic - MAPTemporary bridge installed on Isaacs Branch Rd. due to washout of Bridge # 940178.
Temporary bridge installed on Isaacs Branch Rd. due to washout of Bridge # 940178.
Start Time: 2024-09-30T00:00:00.000-04:00
End Time: 2026-06-27T17:00:00.000-04:00
map local traffic - MAPTemporary bridge installed on Isaacs Branch Rd. due to washout of Bridge # 940178.
Temporary bridge installed on Isaacs Branch Rd. due to washout of Bridge # 940178.
Start Time: 2024-09-30T00:00:00.000-04:00
End Time: 2026-06-27T17:00:00.000-04:00
map local traffic