Current Constructions
- MAPTRAFFIC UPDATE: I-91 SB in Westminster (MM 30-31.5) between Exits 6 & 5, has a left lane closure as NB travel is utilizing a crossover at the bridge. 14' lane restriction.
TRAFFIC UPDATE: I-91 SB in Westminster (MM 30-31.5) between Exits 6 & 5, has a left lane closure as NB travel is utilizing a crossover at the bridge. 14' lane restriction.
Start Time: 2022-10-31T06:00:00.000-04:00
End Time: 2024-11-01T12:10:00.000-04:00
map local traffic - MAPVT-121 near Fisher Hill Rd in Grafton, bridge replacement project. One-way alternating traffic with temporary traffic signals in place.
VT-121 near Fisher Hill Rd in Grafton, bridge replacement project. One-way alternating traffic with temporary traffic signals in place.
Start Time: 2024-03-01T02:00:00.000-05:00
End Time: 2024-11-20T17:00:00.000-05:00