Constructions near Junction at Appletree Court

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    Start Time: 2024-05-28T07:00:00.000-04:00
    End Time: 2024-06-21T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-21T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Colchester, US 2 & US 7 construction: WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES THE REALIGNMENT OF U.S. ROUTE 2 INCLUDING A NEW BRIDGE OVER INTERSTATE 89, REALIGNMENT OF INTERSTATE RAMPS AT EXIT 17, RESURFACING OF U.S. ROUTE 7 WITH THE ADDITION OF STRIPING, GUARDRAIL IMPROVEMENTS, SIGNAGE, BIKE CORRIDOR IMPROVEMENTS, AND OTHER HIGHWAY RELATED ITEMS.
    TRAFFIC ALERT: Colchester, US 2 & US 7 construction: WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES THE REALIGNMENT OF U.S. ROUTE 2 INCLUDING A NEW BRIDGE OVER INTERSTATE 89, REALIGNMENT OF INTERSTATE RAMPS AT EXIT 17, RESURFACING OF U.S. ROUTE 7 WITH THE ADDITION OF STRIPING, GUARDRAIL IMPROVEMENTS, SIGNAGE, BIKE CORRIDOR IMPROVEMENTS, AND OTHER HIGHWAY RELATED ITEMS.
    Start Time: 2024-04-15T00:00:00.000-04:00
    End Time: 2024-06-21T23:59:59.000-04:00