Current Constructions
- MAPUS 12 is reduced to one lane in each direction at Monte-Brady Road in Montesano with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
US 12 is reduced to one lane in each direction at Monte-Brady Road in Montesano with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
Start Time: 2023-08-08T15:00:00.000-07:00
End Time: 2025-12-31T08:00:00.000-08:00