- MAPUS 12 is reduced to one lane in each direction between South 3rd Street and Schouweiler Road with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
US 12 is reduced to one lane in each direction between South 3rd Street and Schouweiler Road with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
Start Time: 2023-09-08T11:21:00.000-07:00
End Time: 2025-12-31T11:21:00.000-08:00
map local traffic - MAPThe Monte-Brady Road intersection with US 12 is closed at milepost 12.5 near Montesano until late 2025 for fish habitat work. Travelers can still exit the highway in either direction but will not be able to enter the highway or cross it. The Monte-Brady Road intersection at milepost 14.7 in Brady will remain open.
The Monte-Brady Road intersection with US 12 is closed at milepost 12.5 near Montesano until late 2025 for fish habitat work. Travelers can still exit the highway in either direction but will not be able to enter the highway or cross it. The Monte-Brady Road intersection at milepost 14.7 in Brady will remain open.
Start Time: 2023-08-25T13:31:00.000-07:00
End Time: 2025-10-01T00:00:00.000-07:00
map local traffic - MAPThe Monte-Brady Road intersection with US 12 is closed at milepost 12.5 near Montesano until late 2025 for fish habitat work. Travelers can still exit the highway in either direction but will not be able to enter the highway or cross it. The Monte-Brady Road intersection at milepost 14.7 in Brady will remain open.
The Monte-Brady Road intersection with US 12 is closed at milepost 12.5 near Montesano until late 2025 for fish habitat work. Travelers can still exit the highway in either direction but will not be able to enter the highway or cross it. The Monte-Brady Road intersection at milepost 14.7 in Brady will remain open.
Start Time: 2023-08-25T13:31:00.000-07:00
End Time: 2025-10-01T00:00:00.000-07:00
map local traffic - MAPUS 12 is reduced to one lane in each direction at Monte-Brady Road near Montesano with both lanes on the eastbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
US 12 is reduced to one lane in each direction at Monte-Brady Road near Montesano with both lanes on the eastbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
Start Time: 2023-08-08T15:00:00.000-07:00
End Time: 2025-12-31T08:00:00.000-08:00
map local traffic - MAPUS 12 is reduced to one lane in each direction between South 3rd Street and Schouweiler Road with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
US 12 is reduced to one lane in each direction between South 3rd Street and Schouweiler Road with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
Start Time: 2023-07-28T18:26:00.000-07:00
End Time: 2025-12-31T11:21:00.000-08:00
map local traffic - MAPUS 12 is reduced to one lane in each direction between Keys Road and Schouweiler Road west of Elma with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
US 12 is reduced to one lane in each direction between Keys Road and Schouweiler Road west of Elma with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
Start Time: 2023-07-28T18:26:00.000-07:00
End Time: 2025-12-31T18:26:00.000-08:00
map local traffic - MAPState Route 8 is reduced to one lane in each direction on the westbound side of the highway between the Grays Harbor County line and McCleary. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
State Route 8 is reduced to one lane in each direction on the westbound side of the highway between the Grays Harbor County line and McCleary. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
Start Time: 2023-08-28T10:33:00.000-07:00
End Time: 2025-09-28T10:33:00.000-07:00
map local traffic - MAPState Route 8 is reduced to one lane in each direction on the westbound side of the highway between the Grays Harbor County line and McCleary. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
State Route 8 is reduced to one lane in each direction on the westbound side of the highway between the Grays Harbor County line and McCleary. The speed limit is reduced to 50 mph for a fish barrier removal project (https://wsdot.wa.gov/construction-planning/search-projects/us-12-sr-8-grays-harbor-county-fish-passage-barriers-remove-fish-barriers).
Start Time: 2023-08-28T10:33:00.000-07:00
End Time: 2025-09-28T10:33:00.000-07:00