Constructions near Junction at Etter Rd
2024-06-30
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork from 3rd Ave / Fuller St to I-76 W.
Roadwork from 3rd Ave / Fuller St to I-76 W.
Start Time: 2024-05-11T08:13:30.000-04:00
End Time: 2024-06-20T23:59:00.000-04:00
map local traffic - MAPI-77 south ramp to I-277/US 224 westbound The ramp from I-77 southbound to I-277/U.S. 224 westbound is closed through fall 2024. The detour is U.S. 224 eastbound to Kelly Ave. to U.S. 224 westbound. Detour: From 2023-08-28 to 2024-11-22, between 05:00 PM and 06:00 AM, I-76WB to I-277WB
I-77 south ramp to I-277/US 224 westbound The ramp from I-77 southbound to I-277/U.S. 224 westbound is closed through fall 2024. The detour is U.S. 224 eastbound to Kelly Ave. to U.S. 224 westbound. Detour: From 2023-08-28 to 2024-11-22, between 05:00 PM and 06:00 AM, I-76WB to I-277WB
Start Time: 2023-08-28T18:00:00.000-04:00
End Time: 2024-11-22T06:00:00.000-05:00
map local traffic