Constructions near I 10 TX exit 539
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPI-10 E / US-87 S is closed from La Cantera Pkwy/Exit 555 (I-10) to FM-1604 W Service/Exit 556A (I-10).
I-10 E / US-87 S is closed from La Cantera Pkwy/Exit 555 (I-10) to FM-1604 W Service/Exit 556A (I-10).
Start Time: 2024-06-07T21:00:00.000-05:00
End Time: 2024-06-10T09:32:00.000-05:00
map local traffic - MAPRoadwork from N Loop 1604 W to C W Anderson Loop.
Roadwork from N Loop 1604 W to C W Anderson Loop.
Start Time: 2024-06-02T23:50:29.000-05:00
End Time: 2024-06-09T23:59:00.000-05:00
map local traffic - MAPLockhill Selma Rd is closed at N Loop 1604 W.
Lockhill Selma Rd is closed at N Loop 1604 W.
Start Time: 2024-06-03T02:33:15.000-05:00
End Time: 2024-06-10T23:59:00.000-05:00
map local traffic - MAPAlternating lanes closed. Use alternate routeDaily & Nightly Alternating Lane Closures
Alternating lanes closed. Use alternate routeDaily & Nightly Alternating Lane Closures
Start Time: 2024-04-22T13:30:00.000-05:00
End Time: 2024-09-30T21:00:00.000-05:00
map local traffic - MAPRoadwork on Prue Rd from Laureate Dr/Research Dr to Babcock Rd.
Roadwork on Prue Rd from Laureate Dr/Research Dr to Babcock Rd.
Start Time: 2024-06-06T23:17:00.000-05:00
End Time: 2024-06-08T07:35:03.520-05:00
map local traffic - MAPRoadwork on E Ramblewood St from US Highway 281 N / E Borgfeld Dr to Twin Peak St.
Roadwork on E Ramblewood St from US Highway 281 N / E Borgfeld Dr to Twin Peak St.
Start Time: 2024-06-06T17:16:06.000-05:00
End Time: 2024-06-08T07:35:03.520-05:00
map local traffic - MAPRoadwork on Boerne Stage Rd from River Rnch to Broad Oak Trl.
Roadwork on Boerne Stage Rd from River Rnch to Broad Oak Trl.
Start Time: 2024-05-21T20:02:30.000-05:00
End Time: 2024-06-08T07:35:03.520-05:00
map local traffic - MAPAll traffic reduced to one lane, two-way traffic control in place, be prepared to stop. One-way traffic control signal. Roadway widening project with traffic control. One lane two way traffic control with temporary traffic signal. Alternate Lane Closures.
All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. One-way traffic control signal. Roadway widening project with traffic control. One lane two way traffic control with temporary traffic signal. Alternate Lane Closures.
Start Time: 2024-04-23T19:49:00.000-05:00
End Time: 2025-04-30T22:00:00.000-05:00
map local traffic - MAPAll traffic reduced to one lane, two-way traffic control in place, be prepared to stop. One-way traffic control signal. Roadway widening project with traffic control. One lane two way traffic control with temporary traffic signal. Alternate Lane Closures.
All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. One-way traffic control signal. Roadway widening project with traffic control. One lane two way traffic control with temporary traffic signal. Alternate Lane Closures.
Start Time: 2024-04-23T19:49:00.000-05:00
End Time: 2025-04-30T22:00:00.000-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeCrews will be widening this portion of SH 46 from 2 lanes to 6 lanes, with a raised median or a center left turn lane. Please be aware of workers and equipment in the roadway and possible lane closures from time to time. All work is weather permitting. Slow down in work zones so everyone gets home safely. Talk. Text. Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeCrews will be widening this portion of SH 46 from 2 lanes to 6 lanes, with a raised median or a center left turn lane. Please be aware of workers and equipment in the roadway and possible lane closures from time to time. All work is weather permitting. Slow down in work zones so everyone gets home safely. Talk. Text. Crash.
Start Time: 2024-01-23T19:20:00.000-06:00
End Time: 2027-01-31T23:00:00.000-06:00
map local traffic - MAPRoadwork on Overlook Pkwy from Canyon Golf Rd to US-281.
Roadwork on Overlook Pkwy from Canyon Golf Rd to US-281.
Start Time: 2024-01-12T10:56:00.000-06:00
End Time: 2024-07-12T00:00:00.000-05:00
map local traffic - MAPRoadwork on Overlook Pkwy from US-281 to Canyon Golf Rd.
Roadwork on Overlook Pkwy from US-281 to Canyon Golf Rd.
Start Time: 2024-01-12T10:54:30.000-06:00
End Time: 2024-07-12T00:00:00.000-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Highway widening project.
Alternating lanes closed. Motorists should expect delays. Highway widening project.
Start Time: 2023-04-28T17:04:00.000-05:00
End Time: 2026-12-31T23:00:00.000-06:00
map local traffic - MAPRoadwork from US Highway 281 N to Overlook Pkwy.
Roadwork from US Highway 281 N to Overlook Pkwy.
Start Time: 2024-01-12T10:54:30.000-06:00
End Time: 2024-07-12T00:00:00.000-05:00
map local traffic - MAPBridge closure at C W Anderson Loop.
Bridge closure at C W Anderson Loop.
Start Time: 2024-06-07T21:00:00.000-05:00
End Time: 2024-06-10T05:00:00.000-05:00
map local traffic