know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along I-45

Constructions near Fort Worth, Texas

      
       UPDATE NOW

click anywhere on map to find more Constructions

Click for Real Time Traffic
 
 

Current Constructions
  • MAP
    Old Santa Fe Trail is closed at Basswood Blvd.
    Old Santa Fe Trail is closed at Basswood Blvd.
    Start Time: 2024-06-14T05:23:03.000-05:00
    End Time: 2024-06-17T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Nighttime closure only. Travel lanes reduced to one lane. Southbound I-820 reduced to one lane between Wilbarger Street and US 287.
    Nighttime closure only. Travel lanes reduced to one lane. Southbound I-820 reduced to one lane between Wilbarger Street and US 287.
    Start Time: 2024-06-14T04:00:00.000-05:00
    End Time: 2024-06-14T11:00:00.000-05:00
    maplocal traffic
  • MAP
    Nighttime closure only. Right lane closed. Double right lane closure on westbound I-20 at US 287.
    Nighttime closure only. Right lane closed. Double right lane closure on westbound I-20 at US 287.
    Start Time: 2024-06-14T04:00:00.000-05:00
    End Time: 2024-06-14T11:00:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on I-820 E from Haltom Rd/Exit 18 (I-820) to Meadow Lakes Dr/Exit 20 (I-820).
    Roadwork on I-820 E from Haltom Rd/Exit 18 (I-820) to Meadow Lakes Dr/Exit 20 (I-820).
    Start Time: 2024-06-14T01:12:30.000-05:00
    End Time: 2024-06-14T07:47:44.835-05:00
    maplocal traffic
  • MAP
    Roadwork on I-820 E from Meadow Lakes Dr/Exit 20 (I-820) to Rufe Snow Dr/Exit 20 (I-820).
    Roadwork on I-820 E from Meadow Lakes Dr/Exit 20 (I-820) to Rufe Snow Dr/Exit 20 (I-820).
    Start Time: 2024-06-14T01:12:30.000-05:00
    End Time: 2024-06-14T07:47:44.835-05:00
    maplocal traffic
  • MAP
    Multiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10. 820 SB multiple alternating lanes for Texasbit level up and surface paving.
    Multiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10. 820 SB multiple alternating lanes for Texasbit level up and surface paving.
    Start Time: 2024-06-13T02:00:00.000-05:00
    End Time: 2024-06-14T11:00:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork from Altamesa Blvd exit [44] to South Fwy.
    Roadwork from Altamesa Blvd exit [44] to South Fwy.
    Start Time: 2024-06-12T23:48:00.000-05:00
    End Time: 2024-06-15T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Nighttime closure only. Travel lanes reduced to one lane. Southbound US 287 reduced to one lane between Little Road and Sublett Road.
    Nighttime closure only. Travel lanes reduced to one lane. Southbound US 287 reduced to one lane between Little Road and Sublett Road.
    Start Time: 2024-06-11T08:05:30.000-05:00
    End Time: 2024-06-14T11:00:00.000-05:00
    maplocal traffic
  • MAP
    Lane closure scheduled 10/06/2024 - 15/06/2024
    Lane closure scheduled 10/06/2024 - 15/06/2024
    Start Time: 2024-06-10T02:00:00.000-05:00
    End Time: 2024-06-15T11:00:00.000-05:00
    maplocal traffic
  • MAP
    E 15th St is closed from E Lancaster Ave / Jones St to Commerce St.
    E 15th St is closed from E Lancaster Ave / Jones St to Commerce St.
    Start Time: 2024-06-11T07:10:45.000-05:00
    End Time: 2024-06-17T23:59:00.000-05:00
    maplocal traffic
  • MAP
    E 15th St is closed from Commerce St to Jones St.
    E 15th St is closed from Commerce St to Jones St.
    Start Time: 2024-06-11T07:10:45.000-05:00
    End Time: 2024-06-17T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Bryan Ave is closed from E Peter Smith St to E Tucker St.
    Bryan Ave is closed from E Peter Smith St to E Tucker St.
    Start Time: 2024-06-11T07:06:47.000-05:00
    End Time: 2024-06-14T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Jerry Ln is closed from Hurst Dr to E Pipeline Rd.
    Jerry Ln is closed from Hurst Dr to E Pipeline Rd.
    Start Time: 2024-06-11T04:48:55.000-05:00
    End Time: 2024-06-14T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Jerry Ln is closed from E Pipeline Rd to Hurst Dr.
    Jerry Ln is closed from E Pipeline Rd to Hurst Dr.
    Start Time: 2024-06-11T04:48:55.000-05:00
    End Time: 2024-06-14T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Martin Luther King Fwy is closed from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
    Martin Luther King Fwy is closed from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
    Start Time: 2024-06-10T14:40:00.000-05:00
    End Time: 2024-06-14T07:47:44.835-05:00
    maplocal traffic
  • MAP
    Anglin Dr is closed from SE Loop 820 to E California Pkwy.
    Anglin Dr is closed from SE Loop 820 to E California Pkwy.
    Start Time: 2024-05-10T09:24:00.000-05:00
    End Time: 2024-06-15T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
    Start Time: 2024-06-10T14:00:00.000-05:00
    End Time: 2024-06-15T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
    Start Time: 2024-06-10T14:00:00.000-05:00
    End Time: 2024-06-15T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
    Start Time: 2024-06-10T14:00:00.000-05:00
    End Time: 2024-06-15T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on E Long Ave from Deen Rd (Long Ave) to US-287 Bus/N Main St (Long Ave).
    Roadwork on E Long Ave from Deen Rd (Long Ave) to US-287 Bus/N Main St (Long Ave).
    Start Time: 2024-06-07T08:35:30.000-05:00
    End Time: 2024-12-31T00:00:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on E Long Ave from US-287 Bus/N Main St (Long Ave) to Deen Rd (Long Ave).
    Roadwork on E Long Ave from US-287 Bus/N Main St (Long Ave) to Deen Rd (Long Ave).
    Start Time: 2024-06-07T08:34:00.000-05:00
    End Time: 2024-12-31T00:00:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on Martin Luther King Fwy from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
    Roadwork on Martin Luther King Fwy from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
    Start Time: 2024-06-04T23:11:00.000-05:00
    End Time: 2024-06-14T07:47:44.835-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
    Start Time: 2024-05-22T07:36:45.000-05:00
    End Time: 2024-07-10T23:55:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
    Roadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
    Start Time: 2024-05-20T06:52:30.000-05:00
    End Time: 2024-06-14T07:47:44.835-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Night work only. ROLLING CLOSURE FOR PAVEMENT TEXTURING ON SH10 FROM IH-820 TO SH183. ALL LANES IN BOTH DIRECTIONS.
    Delays due to slow moving road repair operations. Night work only. ROLLING CLOSURE FOR PAVEMENT TEXTURING ON SH10 FROM IH-820 TO SH183. ALL LANES IN BOTH DIRECTIONS.
    Start Time: 2024-04-26T20:17:00.000-05:00
    End Time: 2024-06-27T10:00:00.000-05:00
    maplocal traffic
  • MAP
    Roadworks scheduled 14/06/2024 - 13/08/2024
    Roadworks scheduled 14/06/2024 - 13/08/2024
    Start Time: 2024-04-04T11:00:20.000-05:00
    End Time: 2024-08-12T20:00:25.000-05:00
    maplocal traffic
  • MAP
    Roadworks scheduled 14/06/2024 - 13/08/2024
    Roadworks scheduled 14/06/2024 - 13/08/2024
    Start Time: 2024-04-04T11:00:20.000-05:00
    End Time: 2024-08-12T20:00:25.000-05:00
    maplocal traffic
  • MAP
    Roadwork at Airport Fwy.
    Roadwork at Airport Fwy.
    Start Time: 2024-06-10T05:41:05.000-05:00
    End Time: 2024-06-17T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork at Airport Fwy.
    Roadwork at Airport Fwy.
    Start Time: 2024-06-09T22:20:30.000-05:00
    End Time: 2024-06-17T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Stationary traffic on I-820 S from Berry St/Exit 31 (I-820) to US-287/Exit 33 (I-820) due to roadwork.
    Stationary traffic on I-820 S from Berry St/Exit 31 (I-820) to US-287/Exit 33 (I-820) due to roadwork.
    Start Time: 2024-06-14T05:49:00.000-05:00
    End Time: 2024-06-14T06:03:00.000-05:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US