Constructions near Fort Worth, Texas
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPOld Santa Fe Trail is closed at Basswood Blvd.
Old Santa Fe Trail is closed at Basswood Blvd.
Start Time: 2024-06-14T05:23:03.000-05:00
End Time: 2024-06-17T23:59:00.000-05:00
map local traffic - MAPNighttime closure only. Travel lanes reduced to one lane. Southbound I-820 reduced to one lane between Wilbarger Street and US 287.
Nighttime closure only. Travel lanes reduced to one lane. Southbound I-820 reduced to one lane between Wilbarger Street and US 287.
Start Time: 2024-06-14T04:00:00.000-05:00
End Time: 2024-06-14T11:00:00.000-05:00
map local traffic - MAPNighttime closure only. Right lane closed. Double right lane closure on westbound I-20 at US 287.
Nighttime closure only. Right lane closed. Double right lane closure on westbound I-20 at US 287.
Start Time: 2024-06-14T04:00:00.000-05:00
End Time: 2024-06-14T11:00:00.000-05:00
map local traffic - MAPRoadwork on I-820 E from Haltom Rd/Exit 18 (I-820) to Meadow Lakes Dr/Exit 20 (I-820).
Roadwork on I-820 E from Haltom Rd/Exit 18 (I-820) to Meadow Lakes Dr/Exit 20 (I-820).
Start Time: 2024-06-14T01:12:30.000-05:00
End Time: 2024-06-14T07:47:44.835-05:00
map local traffic - MAPRoadwork on I-820 E from Meadow Lakes Dr/Exit 20 (I-820) to Rufe Snow Dr/Exit 20 (I-820).
Roadwork on I-820 E from Meadow Lakes Dr/Exit 20 (I-820) to Rufe Snow Dr/Exit 20 (I-820).
Start Time: 2024-06-14T01:12:30.000-05:00
End Time: 2024-06-14T07:47:44.835-05:00
map local traffic - MAPMultiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10. 820 SB multiple alternating lanes for Texasbit level up and surface paving.
Multiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10. 820 SB multiple alternating lanes for Texasbit level up and surface paving.
Start Time: 2024-06-13T02:00:00.000-05:00
End Time: 2024-06-14T11:00:00.000-05:00
map local traffic - MAPRoadwork from Altamesa Blvd exit [44] to South Fwy.
Roadwork from Altamesa Blvd exit [44] to South Fwy.
Start Time: 2024-06-12T23:48:00.000-05:00
End Time: 2024-06-15T23:59:00.000-05:00
map local traffic - MAPNighttime closure only. Travel lanes reduced to one lane. Southbound US 287 reduced to one lane between Little Road and Sublett Road.
Nighttime closure only. Travel lanes reduced to one lane. Southbound US 287 reduced to one lane between Little Road and Sublett Road.
Start Time: 2024-06-11T08:05:30.000-05:00
End Time: 2024-06-14T11:00:00.000-05:00
map local traffic - MAPLane closure scheduled 10/06/2024 - 15/06/2024
Lane closure scheduled 10/06/2024 - 15/06/2024
Start Time: 2024-06-10T02:00:00.000-05:00
End Time: 2024-06-15T11:00:00.000-05:00
map local traffic - MAPE 15th St is closed from E Lancaster Ave / Jones St to Commerce St.
E 15th St is closed from E Lancaster Ave / Jones St to Commerce St.
Start Time: 2024-06-11T07:10:45.000-05:00
End Time: 2024-06-17T23:59:00.000-05:00
map local traffic - MAPE 15th St is closed from Commerce St to Jones St.
E 15th St is closed from Commerce St to Jones St.
Start Time: 2024-06-11T07:10:45.000-05:00
End Time: 2024-06-17T23:59:00.000-05:00
map local traffic - MAPBryan Ave is closed from E Peter Smith St to E Tucker St.
Bryan Ave is closed from E Peter Smith St to E Tucker St.
Start Time: 2024-06-11T07:06:47.000-05:00
End Time: 2024-06-14T23:59:00.000-05:00
map local traffic - MAPJerry Ln is closed from Hurst Dr to E Pipeline Rd.
Jerry Ln is closed from Hurst Dr to E Pipeline Rd.
Start Time: 2024-06-11T04:48:55.000-05:00
End Time: 2024-06-14T23:59:00.000-05:00
map local traffic - MAPJerry Ln is closed from E Pipeline Rd to Hurst Dr.
Jerry Ln is closed from E Pipeline Rd to Hurst Dr.
Start Time: 2024-06-11T04:48:55.000-05:00
End Time: 2024-06-14T23:59:00.000-05:00
map local traffic - MAPMartin Luther King Fwy is closed from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
Martin Luther King Fwy is closed from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
Start Time: 2024-06-10T14:40:00.000-05:00
End Time: 2024-06-14T07:47:44.835-05:00
map local traffic - MAPAnglin Dr is closed from SE Loop 820 to E California Pkwy.
Anglin Dr is closed from SE Loop 820 to E California Pkwy.
Start Time: 2024-05-10T09:24:00.000-05:00
End Time: 2024-06-15T23:59:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Start Time: 2024-06-10T14:00:00.000-05:00
End Time: 2024-06-15T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Start Time: 2024-06-10T14:00:00.000-05:00
End Time: 2024-06-15T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Start Time: 2024-06-10T14:00:00.000-05:00
End Time: 2024-06-15T20:00:00.000-05:00
map local traffic - MAPRoadwork on E Long Ave from Deen Rd (Long Ave) to US-287 Bus/N Main St (Long Ave).
Roadwork on E Long Ave from Deen Rd (Long Ave) to US-287 Bus/N Main St (Long Ave).
Start Time: 2024-06-07T08:35:30.000-05:00
End Time: 2024-12-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on E Long Ave from US-287 Bus/N Main St (Long Ave) to Deen Rd (Long Ave).
Roadwork on E Long Ave from US-287 Bus/N Main St (Long Ave) to Deen Rd (Long Ave).
Start Time: 2024-06-07T08:34:00.000-05:00
End Time: 2024-12-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on Martin Luther King Fwy from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
Roadwork on Martin Luther King Fwy from Carey St (US-287 Frontage) to US-287/Village Creek Rd (US-287 Frontage).
Start Time: 2024-06-04T23:11:00.000-05:00
End Time: 2024-06-14T07:47:44.835-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd NB/SB from 287 to Watauga Smithfield Rd: traffic control to install permanent marking, block sodding, ramps, sidewalk, & work on punch list items.
Start Time: 2024-05-22T07:36:45.000-05:00
End Time: 2024-07-10T23:55:00.000-05:00
map local traffic - MAPRoadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Roadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Start Time: 2024-05-20T06:52:30.000-05:00
End Time: 2024-06-14T07:47:44.835-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Night work only. ROLLING CLOSURE FOR PAVEMENT TEXTURING ON SH10 FROM IH-820 TO SH183. ALL LANES IN BOTH DIRECTIONS.
Delays due to slow moving road repair operations. Night work only. ROLLING CLOSURE FOR PAVEMENT TEXTURING ON SH10 FROM IH-820 TO SH183. ALL LANES IN BOTH DIRECTIONS.
Start Time: 2024-04-26T20:17:00.000-05:00
End Time: 2024-06-27T10:00:00.000-05:00
map local traffic - MAPRoadworks scheduled 14/06/2024 - 13/08/2024
Roadworks scheduled 14/06/2024 - 13/08/2024
Start Time: 2024-04-04T11:00:20.000-05:00
End Time: 2024-08-12T20:00:25.000-05:00
map local traffic - MAPRoadworks scheduled 14/06/2024 - 13/08/2024
Roadworks scheduled 14/06/2024 - 13/08/2024
Start Time: 2024-04-04T11:00:20.000-05:00
End Time: 2024-08-12T20:00:25.000-05:00
map local traffic - MAPRoadwork at Airport Fwy.
Roadwork at Airport Fwy.
Start Time: 2024-06-10T05:41:05.000-05:00
End Time: 2024-06-17T23:59:00.000-05:00
map local traffic - MAPRoadwork at Airport Fwy.
Roadwork at Airport Fwy.
Start Time: 2024-06-09T22:20:30.000-05:00
End Time: 2024-06-17T23:59:00.000-05:00
map local traffic - MAPStationary traffic on I-820 S from Berry St/Exit 31 (I-820) to US-287/Exit 33 (I-820) due to roadwork.
Stationary traffic on I-820 S from Berry St/Exit 31 (I-820) to US-287/Exit 33 (I-820) due to roadwork.
Start Time: 2024-06-14T05:49:00.000-05:00
End Time: 2024-06-14T06:03:00.000-05:00
map local traffic