I-80 Nebraska Traffic and Road Conditions


NE Traffic & Road Condition Reports (102)
I-80 Nebraska Traffic Alerts, I-80 NE Traffic Alerts, I-80 Nebraska Road Conditions, I-80 Nebraska Traffic Reports, Interstate 80 Nebraska Road Conditions, Interstate 80 Nebraska Traffic Reports, I80 Nebraska Road Conditions, I80 Nebraska Traffic Reports, I 80 Nebraska Road Conditions, I 80 Nebraska Traffic Reports, I80 NE Conditions, I80 NE Traffic, I-80 NE Traffic, I-80 NE Conditions, I-80 NE Road Conditions, I-80 NE Traffic Reports, Interstate 80 NE Road Conditions, Interstate 80 NE Traffic Reports, I80 NE Road Conditions, I80 NE Traffic Reports, I 80 NE Road Conditions, I 80 NE Traffic Reports, I80 NE Conditions, I80 NE Traffic, I-80 NE Traffic, I-80 NE Conditions



Green:    more than 50 mph
Orange:    25-50 mph
Red:    less than 25 mph








Nebraska Statewide Traffic and Road Condition Reports

(all events are extracted from NE DOT web sites, or DOT RSS feeds, or Twitter DOT feeds)
Disclaimer: The Data represented here may not be correct and is for reference only. Information may vary from actual roadway conditions and events. Conditions represented on this site are extracted from the latest reported from the DOT web site, some time may have passed since the last update. Actual roadway conditions may vary. Please consult NE DOT web site for the exact information. We DO NOT claim any of this information as proprietary or copyrighted under our ownership in anyway.

search in events

  • Highway: Interstate 680
    Highway: Interstate 680 at OMAHA 72ND STREET INTERCHANGE, Lane closed. slow traffic, Right lane CLOSED 72nd St. to Mormon Bridge until the end of July 2013. Closure is necessary for br idge and pavement repairs. contact: 402-331-5993. Duration: 7:00 AM 03/19/2013 to 6:00 PM 07/31/2013
    5:12 PM 05/23/2013
  • Highway: Interstate 680
    Highway: Interstate 680 at OMAHA L-28H 30TH STREET INTERCHANGE, Lane closed. slow traffic, Right lane CLOSED 30th St to Hwy 36 bridge until the end of July 2013. Closure is necessary for bri dge and pavement repairs. contact: 402-331-5993. Duration: 2:00 PM 03/18/2013 to 6:00 PM 07/31/2013
    5:12 PM 05/23/2013
  • Highway: Interstate 680
    Highway: Interstate 680 at OMAHA FORT STREET INTERCHANGE, Road construction, Various daytime & nighttime lane closures. I-680EB & WB between Fort street and the Missouri River. These lane closures are necessary for multiple bridge & pavement repairs. contact: 402-331-5993. Duration: 7:00 AM 03/18/2013 to 5:00 PM 10/15/2013
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at CASS-SARPY COUNTY LINE, Two lane closed, Right 2 lanes CLOSED due to concrete repair operations. Hwy 6/31 Exit will remain OPEN contact: 402-331-5993. Duration: 10:00 PM 05/29/2013 to 6:00 AM 05/30/2013
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at SUNOL INTERCHANGE NO. 69, Road construction. roadway reduced to one lane, Reduced speed to 55 MPH with single lane traffic.. Duration: 7:03 AM 05/13/2013 to 7:20 PM 08/12/2013
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at GOTHENBURG INTERCHANGE NO. 211, Road construction. roadway reduced to one lane, Roadway reduced to one lane for construction activites. Summer 2013. Duration: 7:00 AM 04/29/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at KIMBALL-CHEYENNE COUNTY LINE, Road construction. roadway reduced to one lane, Traffic is head to head in the eastbound lanes.. Duration: 2:00 PM 04/03/2013 to 11:06 AM 11/09/2013
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at KEITH-LINCOLN COUNTY LINE, Roadway reduced to one lane, Traffic will be reduced to one 12' lane in each direction and the speed limit will be reduced to 55m ph dring periods fo work.. Duration: 12:56 PM 04/08/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at HAMPTON INTERCHANGE NO. 338, Bridge maintenance operations, . Duration: 7:00 AM 03/25/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at AURORA INTERCHANGE NO. 332, Bridge maintenance operations, . Duration: 7:00 AM 04/01/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at LINCOLN NORTH US-77 INTERCHANGE NO. 405, Road construction, Westbound traffic will be placed on the completed EB traffic lanes and separated from the EB traffic by barriers. The WB on ramp from HWY 6 will be closed for the duration of the construction season. Anticipated to be completed Fall 2013. contact: 402-471-6002. Duration: 12:01 AM 03/18/2013 to 5:00 PM 11/30/2013
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at NORTH PLATTE US-83 INTERCHANGE NO. 177, Roadway reduced to one lane, I-80 reduced to one lane for road construction. Fall 2013. Duration: 7:00 AM 03/11/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at CHAPPELL INTERCHANGE NO. 85, Road construction, Lane closures may exist in both East and West bound traveled lanes do to construction on L25A link o verhead bridge. Reduced speed to 55 mph. Duration: 2:37 PM 01/28/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at I-76 INTERCHANGE NO. 102, Road construction, Lane closures during daytime hours with reduced speed zones. Summer 2013. Duration: 7:00 AM 12/05/2012 to 7:00 AM 06/01/2013
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at ROSCOE INTERCHANGE NO. 133, Roadway reduced to one lane, Can expect traffic reduced to one lane in both the east and west bound lanes for pavement restoratio n work, speed limit may be reduced to 55mph. Fall 2013. Duration: 2:24 PM 11/06/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at KEARNEY INTERCHANGE NO. 272, Road construction, Interchange Construction. Duration: 10:03 AM 10/24/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Interstate 80
    Highway: Interstate 80 at LINCOLN NORTH US-77 INTERCHANGE NO. 405, Road construction, One lane night time closers occasionally with lane shifts contact: 402-471-6002. Duration: 7:00 AM 07/09/2012 to 5:00 PM 11/30/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 6
    Highway: Nebraska 6 at JCT I-80 AT WAVERLY INTERCHANGE, On - ramp closed, US-6 on ramp to Westbound I-80 will be closed until November 30, 2013. contact: 402-471-6002. Duration: 9:00 PM 03/17/2013 to 5:00 PM 11/30/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 6
    Highway: Nebraska 6 at WAUNETA, Road construction, Road work will consist of overlaying the pavement and the three bridges between Wauneta and Hamlet. Roadway is reduced to one lane with a 12 Ft width restriction at the three bridges.. Duration: 8:00 AM 04/08/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 6
    Highway: Nebraska 6 at JCT I-80 AT WAVERLY INTERCHANGE, Lane closed, Lane closures E-BND & W-BND. Traffic controlled with Flaggers and Pilot vehicle during daytime opera tions. Pavement repairs, bridge repairs, and asphalt overlay. 12' width restriction. contact: 402-471-6002. Duration: 6:30 AM 04/01/2013 to 5:00 PM 10/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 6
    Highway: Nebraska 6 at JCT US-283 IN ARAPAHOE, Road maintenance operations, . Duration: 7:00 AM 05/20/2013 to 6:00 PM 05/24/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 6
    Highway: Nebraska 6 at JCT N-133 IN OMAHA, Lane closed, Intersection of W. Dodge Rd. & 90th St. & WB Dodge Rd.,from 90th St. to Embassy Row, will have vario us lane restrictions for optic cable installation. contact: 402-444-5220. Duration: 9:00 AM 05/20/2013 to 3:30 PM 05/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 6
    Highway: Nebraska 6 at JCT US-6R IN OMAHA, Lane closed, Effective immediately, Douglas St. will have various lane restrictions at various locations from Tur ner Blvd. to 24th St. Due to ADA ramp & curb repair and will be in effect for 14 days. contact: 402-444-5950. Duration: 1:46 PM 05/20/2013 to 5:00 PM 06/02/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 6
    Highway: Nebraska 6 at JCT L-44C, Road maintenance operations, Armor coat project, expect delays, will be using a pilot car. Reduce speeds recommended throughout project. Duration: 7:30 AM 05/28/2013 to 5:00 PM 06/04/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 6
    Highway: Nebraska 6 at JCT US-6R IN OMAHA, Lane closed, Beginning Saturday, May 25, 2013, at 7:00am, Dodge St. will have one lane closed westbound from 25th St. to 26th Ave. Due to parking garage repairs and will be in effect for 1 day. contact: 402-444-5950. Duration: 7:00 AM 05/25/2013 to 5:00 PM 05/25/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 7
    Highway: Nebraska 7 at BLAINE-BROWN COUNTY LINE, Paving operations. slow traffic, Flagger controled with pilot car. Duration: 7:00 AM 07/08/2013 to 7:00 PM 10/04/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 8
    Highway: Nebraska 8 at JCT US-77, Bridge maintenance operations, Single lane traffic on exiting bridge. Traffic controlled by signals. 12 foot width restriction is in place. contact: 402-471-6002. Duration: 7:00 AM 03/26/2013 to 5:00 PM 08/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 10
    Highway: Nebraska 10 at WEST JCT WITH US-30 AND N-44, Road construction, Head-to-head traffic in the southbound lanes. Semi trucks should follow marked detours. Width restri ction only for N-10 north of Highway 30 intersection. contact: 308-865-5434. Duration: 12:01 AM 07/23/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 11
    Highway: Nebraska 11 at GARFIELD-HOLT COUNTY LINE, Road construction. roadway reduced to one lane, Paving operation. Roadway reduced to one lane during daylight hours. Exact Dates may vary.. Duration: 9:00 AM 08/08/2013 to 9:00 PM 08/16/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 12
    Highway: Nebraska 12 at VERDEL, Narrow lanes, Pilot car is required for overwidth loads @ posted location. This will be inplace indefintly. contact: 402-857-3722. Duration: 8:46 AM 09/27/2011 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 12
    Highway: Nebraska 12 at JCT NIOBRARA NATL WILDLIFE REF SPUR S-16A, Paving operations, Flagger controlled with pilot car. contact: 402-376-1352. Duration: 7:00 AM 06/17/2013 to 7:00 PM 07/19/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 13
    Highway: Nebraska 13 at WEST JCT US-20, Road construction. roadway reduced to one lane, Traffic maintained Possible one lane road with flaggers. Milling and Aspahlt work, Approx. completio n August 2013 contact: 402-254-6552. Duration: 8:14 AM 04/16/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 14
    Highway: Nebraska 14 at JCT S-54A AND N-84 EAST OF VERDIGRE, Narrow lanes. slow traffic, Shoo-fly in place. Use Caution. Speed reduced to 35mph Completion Summer 2013 contact: 402-887-5441. Duration: 11:19 AM 06/30/2011 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 14
    Highway: Nebraska 14 at SOUTH JCT N-22 FULLERTON, Bridge maintenance operations, Traffic moved to temp. road. 45 mph speed limit, thru work zone. no width restrictions. Bridge wor k.. Duration: 7:00 AM 04/01/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 15
    Highway: Nebraska 15 at EAST JCT US-275, Road surface in poor condition. caution, . Duration: 2:21 PM 03/14/2011 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 15
    Highway: Nebraska 15 at EAST JCT US-275, Road construction. roadway reduced to one lane, Traffic maintained , possible one lane road with flaggers Asphalt work. Anticipated completion Augu st 2013 contact: 402-375-7071. Duration: 3:44 PM 04/03/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 15
    Highway: Nebraska 15 at JCT N-91, Roadway reduced to one lane. slow traffic, Milling operation contact: 402-564-4126. Duration: 6:29 AM 05/23/2013 to 6:00 PM 05/23/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 15
    Highway: Nebraska 15 at COLFAX-STANTON COUNTY LINE, Roadway reduced to one lane. slow traffic, Milling contact: 402-564-4126. Duration: 6:00 AM 05/24/2013 to 4:30 PM 05/24/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 19
    Highway: Nebraska 19 at JCT US-30, Road construction. roadway reduced to one lane, Road construction. Roadway will be reduced to one lane as needed. contact: 308-641-8987. Duration: 8:00 AM 05/28/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 20
    Highway: Nebraska 20 at CHERRY-BROWN COUNTY LINE, Paving operations, Flagger controled with pilot car contact: 402.387.2471. Duration: 7:00 AM 04/08/2013 to 7:00 PM 07/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 20
    Highway: Nebraska 20 at JCT PAGE SPUR S-45A, Bridge closed, Bridge Out due to construction. Hwy 20 traffic is detoured though Ewing, NE on NE Link 45B. contact: 402-336-2051. Duration: 12:00 PM 05/21/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 20
    Highway: Nebraska 20 at JCT MCKELVIE NATL FOREST SPUR S-16F, Paving operations, Flagger controlled with pilot car. contact: 402-376-1352. Duration: 7:00 AM 06/24/2013 to 6:00 PM 08/30/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 20
    Highway: Nebraska 20 at RUSHVILLE, Road construction, . Duration: 11:35 AM 06/17/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 23
    Highway: Nebraska 23 at JCT N-18 CURTIS, Road construction. roadway reduced to one lane, . Duration: 7:25 AM 03/12/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 24
    Highway: Nebraska 24 at JCT N-57 IN STANTON, Bridge maintenance operations, Traffic maintained , 12'width limit with temp signals @ Br. RP 9.88 Aspahalt and Bridge work. Antic icpated Completion Summer 2013. contact: 402-370-3474. Duration: 4:04 PM 05/14/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 26
    Highway: Nebraska 26 at WEST JCT N-92 SOUTH OF BAYARD, Road construction, Lane Closures will be ultilized along with reduced speed in construction zones. Please use caution!. Duration: 7:00 AM 04/08/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 30
    Highway: Nebraska 30 at DAWSON-BUFFALO COUNTY LINE, Road construction. roadway reduced to one lane, Roadway reduced to one lane traffic using flaggers and pilot vehicle.Concrete barriers at the bridge locations will reduce lanes to 12ft.. Duration: 7:00 AM 04/01/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 30
    Highway: Nebraska 30 at JCT LINK L-17J SOUTHEAST SIDNEY, Road construction. roadway reduced to one lane, Road construction. Roadway reduced to one lane as needed. contact: 308-641-8987. Duration: 8:00 AM 05/28/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 32
    Highway: Nebraska 32 at JCT US-81 EAST EDGE OF MADISON, Narrow lanes, Hwy 32 in the city of Madison. This will be a permanaent restriction authorized Motor Carrier Divsio n. Max. width 17 foot. Max. length 110 feet. contact: 402-370-3470. Duration: 11:15 AM 06/21/2011 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 34
    Highway: Nebraska 34 at SOUTH JCT N-61, Road construction. roadway reduced to one lane, Work on pavement and two bridges south of Benkelman. Roadway reduced to one lane with 10 Ft width re striction.. Duration: 7:00 AM 07/09/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 34
    Highway: Nebraska 34 at NORTH JCT US-281 AND WEST JCT N-2, Blocked, Bridge removal and replacement. Marked detour using Hwy 281, I-80, South Locust. traffic will be re duced to one lane from ocust St to Blaine St.. Duration: 7:00 AM 03/25/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 34
    Highway: Nebraska 34 at JCT N-15 SEWARD, Lane closed, Lane Closures E-BND and W-BND. Traffic controlled with Flaggers and Pilot vehicle during daytime op erations. Pavement repairs, bridge repairs, and asphalt overlay. 12' width restriction. contact: 402-471-6002. Duration: 6:30 AM 04/01/2013 to 5:00 PM 10/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 34
    Highway: Nebraska 34 at JCT N-63, Lane closed, Lane closures East Bnd and West Bnd. Traffic controlled with flaggers and pilot vehicle during dayt ime operations. Pavement repairs, bridge repairs, and asphalt overlay. 12' width restriction. contact: 402-471-6002. Duration: 6:30 AM 04/22/2013 to 5:00 PM 10/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 46
    Highway: Nebraska 46 at WEST JCT US-136, Road construction, . Duration: 7:00 AM 09/17/2012 to 7:00 PM 09/07/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 47
    Highway: Nebraska 47 at JCT GOTHENBURG I-80 INTERCHANGE NO. 211, Road construction on shoulder, Minor work. Spring 2013. Duration: 7:00 AM 10/29/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 50
    Highway: Nebraska 50 at JCT 18TH STREET IN PAWNEE CITY, Lane closed, Lane Closures N-BND & S-BND. Traffic Controlled with Flaggers and Pilot vehicle during daytime oper ations. Asphalt milling and overlay. 12' Width Restriction contact: 402-471-6002. Duration: 7:00 AM 05/13/2013 to 5:00 PM 07/15/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 57
    Highway: Nebraska 57 at JCT N-32 SOUTH OF STANTON, Bridge maintenance operations, Traffic Maintained , 12'width limit with temp signals @ Br RP 15+66. Bridge and Aspahlt work. Antici pated competion Summer 2013 contact: 402-370-3474. Duration: 4:07 PM 05/14/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 61
    Highway: Nebraska 61 at WEST JCT US-20 MERRIMAN, Bridge maintenance operations, Paving operation. Roadway reduced to one lane during daylight hours. Exact Dates may vary.. Duration: 7:00 AM 07/17/2013 to 9:00 PM 07/29/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 64
    Highway: Nebraska 64 at JCT N-133 LINK L-28K, Lane closed, NW Radial Hwy will have an EB lane CLOSED from 58th St. to 57th St. Necessary for intersection impro vements. contact: 402-444-5220. Duration: 9:00 AM 04/15/2013 to 5:00 PM 07/14/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 70
    Highway: Nebraska 70 at GARFIELD-WHEELER COUNTY LINE, Paving operations, Flagger controlled, with Pilot Car.. Duration: 7:00 AM 09/03/2013 to 5:00 PM 10/11/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 75
    Highway: Nebraska 75 at NORTH JCT US-34, Road construction. slow traffic, Flagging operations daily starting 8-8-12 @ 9am until summer 2013. Beginning 11-28-12 NB/SB US-75 tr affic will be maintained on new NB US-75 between Plattsmouth & School Road for construction of SB US -75. contact: 402-331-5993. Duration: 7:00 AM 03/05/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 75
    Highway: Nebraska 75 at CASS-SARPY COUNTY LINE, Road construction, Reconstruction of US 75 from Platteview Road to Platte River. contact: 402-331-5993. Duration: 7:37 AM 11/20/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 77
    Highway: Nebraska 77 at NORTH JCT N-109 EAST OF CEDAR BLUFFS, Road construction, Speed limit reduced to 45 MPH. Grading with flagger support. Expect possible delays through the cons truction zone.. Duration: 6:00 AM 03/24/2011 to 8:00 AM 10/31/2016
    5:12 PM 05/23/2013
  • Highway: Nebraska 77
    Highway: Nebraska 77 at SAUNDERS-DODGE COUNTY LINE, Road construction, Traffic will be shifted onto a temporary alignment to allow for the removal of portions of the exist ing roadway and the construction of the new roadway. Detours Posted. Completion date Summer 2013 Wea ther Permitting. contact: 402-331-5993. Duration: 7:00 AM 03/22/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 83
    Highway: Nebraska 83 at JCT US-30 NORTH PLATTE, Road construction. roadway reduced to one lane, Road Construction. Traffic may be reduced to one lane, north and south. Fall 2013. Duration: 8:38 AM 04/16/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 83
    Highway: Nebraska 83 at JCT I-80 NORTH PLATTE INTERCHANGE NO. 177, Road construction, Road Construction. Traffic may be reduced to one lane, north and south. Spring 2013.. Duration: 7:00 AM 04/16/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 83
    Highway: Nebraska 83 at EAST JCT N-2 EAST OF THEDFORD, Paving operations, Flaggers with pilot car. Duration: 7:00 AM 04/01/2013 to 7:00 PM 06/11/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 84
    Highway: Nebraska 84 at JCT N-14 AND VERDIGRE SPUR S-54A, Narrow lanes. slow traffic, Shoo-fly in place. Use caution. Speed reduced to 35 mph Appox. completion Summer 2013 contact: 402-887-5441. Duration: 4:17 PM 04/20/2011 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 87
    Highway: Nebraska 87 at BOX BUTTE-SHERIDAN COUNTY LINE, Road construction, . Duration: 7:56 AM 04/15/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 89
    Highway: Nebraska 89 at JCT US-83, Road construction. roadway reduced to one lane, Roadwork will involve minor grading, culvert construction, replacing guardrail, work on four bridges , and overlaying the roadway with asphalt. Bridge work will be performed by lane closures. contact: 308-345-8490. Duration: 7:41 AM 03/04/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 89
    Highway: Nebraska 89 at BEAVER CITY, Road construction. roadway reduced to one lane, . Duration: 8:00 AM 04/01/2013 to 5:00 PM 09/01/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 91
    Highway: Nebraska 91 at SOUTHEAST JCT US-275 AND US-77, Road construction, Seeding and shoulder work. Use caution. contact: 402-331-5993. Duration: 9:14 AM 06/19/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 95
    Highway: Nebraska 95 at CHAMBERS, Paving operations, Flagger controlled, with Pilot Car. Contact 402-336-2051.. Duration: 7:00 AM 08/19/2013 to 5:00 PM 10/15/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 96
    Highway: Nebraska 96 at JCT US-183, Road construction. roadway reduced to one lane, Controlled by Traffic Signal. contact: 402-760-2717. Duration: 7:00 AM 04/29/2013 to 7:00 PM 06/24/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 97
    Highway: Nebraska 97 at JCT US-20, Road construction. roadway reduced to one lane, Paving operation. Roadway reduced to one lane during daylight hours. Exact Dates may vary.. Duration: 7:00 AM 09/09/2013 to 9:00 PM 09/13/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 112
    Highway: Nebraska 112 at KANSAS-NEBRASKA STATE LINE, Lane closed, Lane closures North-BND and South-BND. Traffic controlled with flaggers and pilot vehicle during da ytime operations. Pavement repairs, bridge repairs, and asphalt overlay. 12' width restriction.. Duration: 6:30 AM 04/22/2013 to 5:00 PM 07/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 133
    Highway: Nebraska 133 at DOUGLAS-WASHINGTON COUNTY LINE, Road construction. slow traffic, Highway widening project beginning @ Dutch Hall Rd and continuing for 5 miles (north and south) for approx 3 yrs. Work includes tree grubbing, culvert extensions and grading over the winter months. No traffic interuptions expected. contact: 402-331-5993. Duration: 11:00 AM 11/21/2012 to 7:00 AM 11/30/2015
    5:12 PM 05/23/2013
  • Highway: Nebraska 133
    Highway: Nebraska 133 at DOUGLAS-WASHINGTON COUNTY LINE, Closed to traffic due to road construction, Pawnee Road will be CLOSED east of N-133. This closure is necessary for grading on Pawnee Road at N- 133. contact: 402-331-5993. Duration: 8:00 AM 04/15/2013 to 5:00 PM 05/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 133
    Highway: Nebraska 133 at DOUGLAS-WASHINGTON COUNTY LINE, Closed to traffic due to road construction, County Road P38A will be CLOSED West of N-133. This closure is necessary for grading construction al ong N-133. contact: 402-331-5993. Duration: 9:00 AM 05/24/2013 to 5:00 PM 10/31/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 136
    Highway: Nebraska 136 at JCT N-78 NORTH OF GUIDE ROCK, Road construction, 10' width restriction in effect on project (bridge work at mile post 81.8). Asphalt paving, culverts and grading work. One lane traffic controlled with flaggers and pilot car.. Duration: 7:00 AM 04/08/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 136
    Highway: Nebraska 136 at WEST JCT N-4, Lane closed, Lane closure for curb and sidewalk repair. contact: 402-471-6002. Duration: 2:56 PM 05/06/2013 to 5:00 PM 06/30/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 137
    Highway: Nebraska 137 at JCT US-20, Road construction. roadway reduced to one lane, Paving operation. Roadway reduced to one lane during daylight hours. Exact Dates may vary. contact: 402.387.2471. Duration: 7:00 AM 08/19/2013 to 9:00 PM 08/30/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 138
    Highway: Nebraska 138 at COLORADO-NEBRASKA STATE LINE, Road construction. roadway reduced to one lane, Detour/Road Closed to through traffic from PR 3+60 to RP 4+07 for bridge and box culvert work. Clic k Construction Detour tab above to see Detour Route. One lane traffic during daytime operations. Fa ll 2013. Duration: 7:00 AM 04/24/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 138
    Highway: Nebraska 138 at JCT I-80 INTERCHANGE NO. 101, Closed to traffic due to road construction, Open to local traffic only...Click on Construction Detour tab above for Detour Route..Fall 2013. Duration: 11:20 AM 05/02/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 138
    Highway: Nebraska 138 at JCT I-80 INTERCHANGE NO. 101, Road construction. roadway reduced to one lane, Detour/Road closed to thru traffic from RP 4+07 to RP 9+37 for phase I, box culvert work. Click Cons t. Detour Map Tab above to see detour. Asph. work with flaggers/pilot car for Phase II. One lane tra ffic during daytime opeations...2013. Duration: 7:00 AM 05/20/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 183
    Highway: Nebraska 183 at NORTH JCT N-91 IN TAYLOR, Bridge maintenance operations, Bridge COnstruction contact: 402.760.2717. Duration: 7:00 AM 04/29/2013 to 7:00 PM 06/10/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 183
    Highway: Nebraska 183 at EAST JCT US-20 AND N-7, Road construction. roadway reduced to one lane, Paving operation. Roadway reduced to one lane during daylight hours. Exact Dates may vary.. Duration: 7:00 AM 07/30/2013 to 9:00 PM 08/07/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 183
    Highway: Nebraska 183 at NORTH JCT N-70, Roadway reduced to one lane, Speed Zones, Flagging Operations with pilot car. One lane traffic. Grading, Shld. Widening, Mill & O verlay. Bridge deck repair...Fall 2013. Duration: 7:00 AM 05/20/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 275
    Highway: Nebraska 275 at JCT N-9, Road surface in poor condition. caution, Traffic Maintained , No Overweight permit traffic utill further notice due to the condtion of the br idge structure. contact: 402-370-3477. Duration: 1:56 PM 10/25/2011 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 275
    Highway: Nebraska 275 at JCT N-57 NORTH OF STANTON, Road construction on shoulder, Traffic maintained. Culvert work Anticipated completion May 2013 contact: 402-370-3474. Duration: 3:55 PM 10/16/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 275
    Highway: Nebraska 275 at JCT US-75, Road construction, Contact: 402-331-5993. Duration: 7:00 AM 02/04/2013 to 4:30 PM 05/04/2015
    5:12 PM 05/23/2013
  • Highway: Nebraska 275
    Highway: Nebraska 275 at JCT N-57 NORTH OF STANTON, Road construction. roadway reduced to one lane, Traffic maintained. 10 ft width limit with temp signals Br. @ RP 87+42 and RP 93+10 Anticipated comp letion summer 2013 Asphalt and Bridge work contact: 402-370-3474. Duration: 8:51 AM 04/08/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 275
    Highway: Nebraska 275 at WEST JCT N-15 NORTH OF PILGER, Bridge maintenance operations, Traffic Maintained. 12' width limit , Temp Signals Br. @ RP 94+21. Anticipated completion Summer 201 3. Asphalt and Bridge work contact: 402-370-3474. Duration: 8:55 AM 04/08/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 275
    Highway: Nebraska 275 at HOLT-ANTELOPE COUNTY LINE, Paving operations, Contractor will be milling existing asphalt surfacing and paving. Within Ewing corporate limits, the contractor will be patching & grinding the existing concrete surfacing. For more information contact: 402-336-2051. Duration: 6:00 AM 05/13/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 275
    Highway: Nebraska 275 at EAST JCT US-30, Lane closed, Various lane closures due to highway pavement striping. Use Caution and Expect Possible Delays.. Duration: 10:33 AM 05/17/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 281
    Highway: Nebraska 281 at WEBSTER-ADAMS COUNTY LINE, Utility work on shoulder. caution, Traffic maintained. Minor construction work remaining. Some Shoulder work. No width Restrictions. contact: (402)462-1996. Duration: 7:00 AM 05/14/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska 281
    Highway: Nebraska 281 at WEST JCT US-6 AND US-34 IN HASTINGS, Bridge maintenance operations, Construction consists of Milling and an Asphalt overlay. Traffic Controled by Flaggers and pilot car . There will be a 12'width restriction on this Project. contact: (420)462-1996. Duration: 3:10 PM 04/01/2013 to 5:10 PM 06/15/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 370
    Highway: Nebraska 370 at JCT US-6 AND N-31 IN GRETNA, Road construction, Temporary traffic signals in place. Expect slow traffic and delays possible. 192nd Street North of N-370 CLOSED. Also Scheduled Closing of 204th Street north and south of N-370. Head to Head traffic 186th st west to US-6/N-31 intersection contact: 402-331-5993. Duration: 1:00 PM 03/23/2011 to 8:00 AM 09/30/2013
    5:12 PM 05/23/2013
  • Highway: Nebraska 385
    Highway: Nebraska 385 at NORTH JCT N-2, Road construction, . Duration: 11:37 AM 05/06/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska L25A
    Highway: Nebraska L25A at CHAPPELL I-80 INTERCHANGE NO. 85, Roadway reduced to one lane, L25A Bridge over interstate reduced to one lane with use of traffic signals. No wide loads over 12' permitted.. Duration: 1:52 PM 08/21/2012 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska L40C
    Highway: Nebraska L40C at JCT US-30, Paving operations, Milling and asphalt overlay. Traffic maintained. Traffic reduced to one lane, flagman and pilot ve hical.. Duration: 7:00 AM 05/20/2013 to Indefinite Indefinite
    5:12 PM 05/23/2013
  • Highway: Nebraska S16B
    Highway: Nebraska S16B at JCT US-83, Road construction. roadway reduced to one lane, Paving operation. Roadway reduced to one lane during daylight hours. Exact Dates may vary.. Duration: 9:00 AM 09/02/2013 to 9:00 PM 09/06/2013
    5:12 PM 05/23/2013



Thank you for using Roadnow.

We hope you enjoy your trip.




Who We AreOur Privacy PolicyOur Security