- MAPRoadwork on I-70 E from CO-57/Colorado Ave/Exit 419 (I-70) to US-385/Lincoln St/Exit 437 (I-70).
Roadwork on I-70 E from CO-57/Colorado Ave/Exit 419 (I-70) to US-385/Lincoln St/Exit 437 (I-70).
Start Time: 2025-04-08T15:51:30.000-06:00
End Time: 2025-06-20T06:48:28.952-06:00
map local traffic - MAPBetween US 385 and CO 57 (1 to 11 miles west of Burlington) from Mile Point 436 to Mile Point 426. Road construction. Until June 30, 2025 at about 11:59AM MDT. Full schedule below: • June 16, 12:00AM - June 30, 11:59AM Comment: Eastbound traffic will be routed onto WB I-70 in a single lane, head to head traffic configuration. Expect reduced speeds.
Between US 385 and CO 57 (1 to 11 miles west of Burlington) from Mile Point 436 to Mile Point 426. Road construction. Until June 30, 2025 at about 11:59AM MDT. Full schedule below: • June 16, 12:00AM - June 30, 11:59AM Comment: Eastbound traffic will be routed onto WB I-70 in a single lane, head to head traffic configuration. Expect reduced speeds.
Start Time: 2025-03-26T09:26:30.000-06:00
End Time: 2025-06-30T23:59:00.000-06:00