Constructions near I 70 exit 29
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPGRE-35-0.08 westbound. A bridge and pavement rehabilitation project on U.S. 35, between the Montgomery County line and the bridge over Grange Hall Road. U.S. 35 West traffic will be reduced to one, 12-foot lane for 90 days (through mid-September). U.S. 35 East will be maintained in two, 12-foot lanes.
GRE-35-0.08 westbound. A bridge and pavement rehabilitation project on U.S. 35, between the Montgomery County line and the bridge over Grange Hall Road. U.S. 35 West traffic will be reduced to one, 12-foot lane for 90 days (through mid-September). U.S. 35 East will be maintained in two, 12-foot lanes.
Start Time: 2025-06-17T15:15:00.000-04:00
End Time: 2026-10-01T07:00:00.000-04:00
map local traffic - MAPSR 4 between Valley Street and Harshman Rd in both directions. SR 4 between Valley Street and Harshman Avenue will be reduced to a single lane in each direction. Southbound traffic will be shifted onto the northbound side by use of a contraflow lane starting Monday, May 12 through July 2025. The ramp from SR 4 South to Findlay Street will be closed through the duration of this traffic pattern.
SR 4 between Valley Street and Harshman Rd in both directions. SR 4 between Valley Street and Harshman Avenue will be reduced to a single lane in each direction. Southbound traffic will be shifted onto the northbound side by use of a contraflow lane starting Monday, May 12 through July 2025. The ramp from SR 4 South to Findlay Street will be closed through the duration of this traffic pattern.
Start Time: 2025-05-17T22:01:30.000-04:00
End Time: 2025-07-20T00:59:00.000-04:00
map local traffic - MAPEastman Ave is closed from Dora Ave to Woodman Dr.
Eastman Ave is closed from Dora Ave to Woodman Dr.
Start Time: 2025-06-02T10:58:00.000-04:00
End Time: 2025-06-18T08:22:01.595-04:00
map local traffic - MAPRoadwork on Sue Anne Blvd at Shoup Mill Rd.
Roadwork on Sue Anne Blvd at Shoup Mill Rd.
Start Time: 2025-06-17T10:14:00.000-04:00
End Time: 2025-06-18T08:22:01.596-04:00
map local traffic - MAPRoadwork on Nicholas Rd from Danner Ave to S Broadway St/Dryden Rd.
Roadwork on Nicholas Rd from Danner Ave to S Broadway St/Dryden Rd.
Start Time: 2025-06-05T20:14:00.000-04:00
End Time: 2025-06-18T08:22:01.596-04:00
map local traffic - MAPRoadwork on Ross Rd / County Hwy-179 from Sullivan Rd to Wildcat Rd.
Roadwork on Ross Rd / County Hwy-179 from Sullivan Rd to Wildcat Rd.
Start Time: 2025-06-03T20:10:00.000-04:00
End Time: 2025-06-18T08:22:01.596-04:00
map local traffic - MAPRoadwork on McClerron Memorial Skyway from OH-444 exit [3] to H St.
Roadwork on McClerron Memorial Skyway from OH-444 exit [3] to H St.
Start Time: 2025-06-16T06:09:30.000-04:00
End Time: 2025-06-18T08:24:31.983-04:00
map local traffic