know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along I-75

Constructions near I 75 exit 52b a

      
       UPDATE NOW

click anywhere on map to find more Constructions

Click for Real Time Traffic
 
 

Current Constructions
  • MAP
    GRE-35-0.08 westbound. A bridge and pavement rehabilitation project on U.S. 35, between the Montgomery County line and the bridge over Grange Hall Road. U.S. 35 West traffic will be reduced to one, 12-foot lane for 90 days (through mid-September). U.S. 35 East will be maintained in two, 12-foot lanes.
    GRE-35-0.08 westbound. A bridge and pavement rehabilitation project on U.S. 35, between the Montgomery County line and the bridge over Grange Hall Road. U.S. 35 West traffic will be reduced to one, 12-foot lane for 90 days (through mid-September). U.S. 35 East will be maintained in two, 12-foot lanes.
    Start Time: 2025-06-17T15:15:00.000-04:00
    End Time: 2026-10-01T07:00:00.000-04:00
    maplocal traffic
  • MAP
    SR 4 between Valley Street and Harshman Rd in both directions. SR 4 between Valley Street and Harshman Avenue will be reduced to a single lane in each direction. Southbound traffic will be shifted onto the northbound side by use of a contraflow lane starting Monday, May 12 through July 2025. The ramp from SR 4 South to Findlay Street will be closed through the duration of this traffic pattern.
    SR 4 between Valley Street and Harshman Rd in both directions. SR 4 between Valley Street and Harshman Avenue will be reduced to a single lane in each direction. Southbound traffic will be shifted onto the northbound side by use of a contraflow lane starting Monday, May 12 through July 2025. The ramp from SR 4 South to Findlay Street will be closed through the duration of this traffic pattern.
    Start Time: 2025-05-17T22:01:30.000-04:00
    End Time: 2025-07-20T00:59:00.000-04:00
    maplocal traffic
  • MAP
    Wagner-Ford Road to I-75 Southbound . The Ramp from Wagner-Ford Road to I-75 South will be closed from Sunday, August 24, 2024 through June 2025. This closure is necessary to reconstruct I-75 in this area. Detour: From 2025-05-19 to 2025-07-19, between 12:00 AM and 11:59 PM, WAGNER FORD RD TO N DIXIE DR TO NEEDMORE RD
    Wagner-Ford Road to I-75 Southbound . The Ramp from Wagner-Ford Road to I-75 South will be closed from Sunday, August 24, 2024 through June 2025. This closure is necessary to reconstruct I-75 in this area. Detour: From 2025-05-19 to 2025-07-19, between 12:00 AM and 11:59 PM, WAGNER FORD RD TO N DIXIE DR TO NEEDMORE RD
    Start Time: 2025-05-13T05:16:30.000-04:00
    End Time: 2026-10-31T00:59:00.000-04:00
    maplocal traffic
  • MAP
    S.R. 122/Elk Creek Rd. Roundabout in both directions. Construction of single-lane roundabout on S.R. 122 at Elk Creek Road. The intersection will be closed for 90 days beginning Monday, June 2, and motorists will be detoured via S.R. 122, S.R. 725, S.R. 503, S.R. 73 and S.R. 4. A local detour will also be provided for Elk Creek Road traffic via Howe Road, Trenton Franklin Road, S.R.
    S.R. 122/Elk Creek Rd. Roundabout in both directions. Construction of single-lane roundabout on S.R. 122 at Elk Creek Road. The intersection will be closed for 90 days beginning Monday, June 2, and motorists will be detoured via S.R. 122, S.R. 725, S.R. 503, S.R. 73 and S.R. 4. A local detour will also be provided for Elk Creek Road traffic via Howe Road, Trenton Franklin Road, S.R.
    Start Time: 2025-06-03T16:03:00.000-04:00
    End Time: 2025-11-02T00:59:00.000-04:00
    maplocal traffic
  • MAP
    Eastman Ave is closed from Dora Ave to Woodman Dr.
    Eastman Ave is closed from Dora Ave to Woodman Dr.
    Start Time: 2025-06-02T10:58:00.000-04:00
    End Time: 2025-06-21T08:18:07.670-04:00
    maplocal traffic
  • MAP
    SR 123/Community Park Drive northbound. On SR 123, between Tama Lane and Sunnybrook Drive in the city of Franklin. Construction includes realigning Community Park Drive opposite the drive to Franklin High School and building a roundabout with crosswalks.
    SR 123/Community Park Drive northbound. On SR 123, between Tama Lane and Sunnybrook Drive in the city of Franklin. Construction includes realigning Community Park Drive opposite the drive to Franklin High School and building a roundabout with crosswalks.
    Start Time: 2025-03-01T00:00:00.000-05:00
    End Time: 2025-07-26T00:59:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on Sue Anne Blvd at Shoup Mill Rd.
    Roadwork on Sue Anne Blvd at Shoup Mill Rd.
    Start Time: 2025-06-17T10:14:00.000-04:00
    End Time: 2025-06-21T08:18:07.670-04:00
    maplocal traffic
  • MAP
    Roadwork on Nicholas Rd from Danner Ave to S Broadway St/Dryden Rd.
    Roadwork on Nicholas Rd from Danner Ave to S Broadway St/Dryden Rd.
    Start Time: 2025-06-05T20:14:00.000-04:00
    End Time: 2025-06-21T08:18:07.671-04:00
    maplocal traffic
  • MAP
    Roadwork on Ross Rd / County Hwy-179 from Sullivan Rd to Wildcat Rd.
    Roadwork on Ross Rd / County Hwy-179 from Sullivan Rd to Wildcat Rd.
    Start Time: 2025-06-03T20:10:00.000-04:00
    End Time: 2025-06-21T08:18:07.671-04:00
    maplocal traffic
  • MAP
    Roadwork on McClerron Memorial Skyway from OH-444 exit [3] to H St.
    Roadwork on McClerron Memorial Skyway from OH-444 exit [3] to H St.
    Start Time: 2025-06-20T13:09:30.000-04:00
    End Time: 2025-06-21T08:20:39.680-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US