NYSDOT Region 9: Roadwork On US 11 Both Directions Between Exit 6 Off Ramp (Chenango) And Farrell Drive (Chenango) 1 Alternate Lanes Of 2 Lanes Blocked For Deck Repairs, And Paving To Occur From 4/1 Through 4/30 During The Hours Of 7:00 AM To 7:00 PM. This Work Is Weather Dependent With No Flagger Personnel Present. All Traffic Controlled Via Temporary Signal. Started Open Reach. IR# 4999091 D265118 Traffic
2024-05-03
Roadnow