Constructions near I 85 exit 71
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPRoadwork on US-29 N / US-601 N / Concord Pkwy N from McGill Ave/Poplar Tent Rd (US-29) to Old NC-73/Davidson Hwy (US-29).
Roadwork on US-29 N / US-601 N / Concord Pkwy N from McGill Ave/Poplar Tent Rd (US-29) to Old NC-73/Davidson Hwy (US-29).
Start Time: 2025-05-25T10:11:00.000-04:00
End Time: 2025-06-17T07:32:03.337-04:00
map local traffic - MAPConstruction: Stormwater will be closing Suburban Ave while they replace the pipe under the roadway. This closure will run the length of the road, from LeCline to Beverly, and will be completely closed to through traffic. Estimated time for reopening could possibly be 3 months.
Construction: Stormwater will be closing Suburban Ave while they replace the pipe under the roadway. This closure will run the length of the road, from LeCline to Beverly, and will be completely closed to through traffic. Estimated time for reopening could possibly be 3 months.
Start Time: 2025-05-06T08:00:17.000-04:00
End Time: 2025-08-06T17:00:00.000-04:00
map local traffic - MAPConstruction: Stormwater will be closing Suburban Ave while they replace the pipe under the roadway. This closure will run the length of the road, from LeCline to Beverly, and will be completely closed to through traffic. Estimated time for reopening could possibly be 3 months.
Construction: Stormwater will be closing Suburban Ave while they replace the pipe under the roadway. This closure will run the length of the road, from LeCline to Beverly, and will be completely closed to through traffic. Estimated time for reopening could possibly be 3 months.
Start Time: 2025-05-06T08:00:17.000-04:00
End Time: 2025-08-06T17:00:00.000-04:00
map local traffic - MAPRobert Walker Rd. will close at the western side of the intersection with Davidson-Concord Rd. for the construction of a roundabout.
Robert Walker Rd. will close at the western side of the intersection with Davidson-Concord Rd. for the construction of a roundabout.
Start Time: 2025-04-28T09:25:00.000-04:00
End Time: 2025-06-30T10:25:00.000-04:00
map local traffic - MAPAt 8:00AM on Monday February 17th, contract crews for NCDOT will close Ebenezer Road between Bostian Road and E 22nd Street to replace the existing bridge structure over Beaver Creek. Construction is anticipated to be completed by July 1, 2025. Ebenezer Road will be closed to through traffic between Bostian Rd and E 22nd St, drivers should utilize the signed detour consisting of Bostian Rd, Old Beatty Ford Rd, and US29 (N Cannon Blvd).
At 8:00AM on Monday February 17th, contract crews for NCDOT will close Ebenezer Road between Bostian Road and E 22nd Street to replace the existing bridge structure over Beaver Creek. Construction is anticipated to be completed by July 1, 2025. Ebenezer Road will be closed to through traffic between Bostian Rd and E 22nd St, drivers should utilize the signed detour consisting of Bostian Rd, Old Beatty Ford Rd, and US29 (N Cannon Blvd).
Start Time: 2025-02-17T08:00:00.000-05:00
End Time: 2025-07-01T08:00:00.000-04:00
map local traffic - MAPAt 8:00AM on Monday February 17th, contract crews for NCDOT will close Ebenezer Road between Bostian Road and E 22nd Street to replace the existing bridge structure over Beaver Creek. Construction is anticipated to be completed by July 1, 2025. Ebenezer Road will be closed to through traffic between Bostian Rd and E 22nd St, drivers should utilize the signed detour consisting of Bostian Rd, Old Beatty Ford Rd, and US29 (N Cannon Blvd).
At 8:00AM on Monday February 17th, contract crews for NCDOT will close Ebenezer Road between Bostian Road and E 22nd Street to replace the existing bridge structure over Beaver Creek. Construction is anticipated to be completed by July 1, 2025. Ebenezer Road will be closed to through traffic between Bostian Rd and E 22nd St, drivers should utilize the signed detour consisting of Bostian Rd, Old Beatty Ford Rd, and US29 (N Cannon Blvd).
Start Time: 2025-02-17T08:00:00.000-05:00
End Time: 2025-07-01T08:00:00.000-04:00
map local traffic - MAPBridge replacement over Weathers Creek
Bridge replacement over Weathers Creek
Start Time: 2024-09-23T07:00:00.000-04:00
End Time: 2025-08-15T17:00:00.000-04:00
map local traffic - MAPRoadwork on NC-153 / N NC Highway 153 from NC-152 (W Rice St/NC-153) to Mount Moriah Church Rd/Cannon Farm Rd (W Rice St/NC-153).
Roadwork on NC-153 / N NC Highway 153 from NC-152 (W Rice St/NC-153) to Mount Moriah Church Rd/Cannon Farm Rd (W Rice St/NC-153).
Start Time: 2025-04-18T20:15:30.000-04:00
End Time: 2025-06-17T07:32:03.337-04:00
map local traffic - MAPThe road is closed between NC 49 and Lowder Rd.
The road is closed between NC 49 and Lowder Rd.
Start Time: 2025-04-15T09:46:36.000-04:00
End Time: 2025-10-23T00:00:00.000-04:00
map local traffic - MAPThe road is closed between NC 49 and Lowder Rd.
The road is closed between NC 49 and Lowder Rd.
Start Time: 2025-04-15T09:46:36.000-04:00
End Time: 2025-10-23T00:00:00.000-04:00
map local traffic - MAPRoad closed due to pipe failure
Road closed due to pipe failure
Start Time: 2024-05-25T12:55:00.000-04:00
End Time: 2025-06-30T14:00:00.000-04:00
map local traffic