- MAPRoadwork on I-90 W from Lorain County West Toll Plaza (I-90) to I-80 (I-90).
Roadwork on I-90 W from Lorain County West Toll Plaza (I-90) to I-80 (I-90).
Start Time: 2024-04-30T20:43:00.000-04:00
End Time: 2024-05-02T07:58:12.854-04:00
map local traffic - MAPRoadwork on Bellaire Rd from I-71/W 120th St to W 130th St.
Roadwork on Bellaire Rd from I-71/W 120th St to W 130th St.
Start Time: 2024-04-24T08:42:30.000-04:00
End Time: 2024-05-02T07:58:12.854-04:00
map local traffic - MAPRoadwork on Poplar St from Gulf Rd to Harwood St.
Roadwork on Poplar St from Gulf Rd to Harwood St.
Start Time: 2024-04-05T07:53:30.000-04:00
End Time: 2024-05-02T07:58:12.854-04:00
map local traffic - MAPState Route 18 bridge replacements in both directions. State Route 18, between SR 83 and Bryenton Road, will have single lane closures for 225 days to complete project work. Traffic will be maintained by temporary traffic signals. The lanes of traffic will be narrowed to 12’ width max.
State Route 18 bridge replacements in both directions. State Route 18, between SR 83 and Bryenton Road, will have single lane closures for 225 days to complete project work. Traffic will be maintained by temporary traffic signals. The lanes of traffic will be narrowed to 12’ width max.
Start Time: 2024-03-25T01:00:00.000-04:00
End Time: 2024-11-15T23:59:00.000-05:00
map local traffic - MAPSR 10 over Rocky River in both directions. SR 10 (Lorain Ave.) over the Rocky River will be reduced to one lane in each direction beginning Monday, March 18, through mid-November.
SR 10 over Rocky River in both directions. SR 10 (Lorain Ave.) over the Rocky River will be reduced to one lane in each direction beginning Monday, March 18, through mid-November.
Start Time: 2024-03-18T01:00:00.000-04:00
End Time: 2024-11-15T23:59:00.000-05:00