Construction On SR 23 In Both Directions From Milepost 0.0 In Steptoe To Milepost 54.0 About 10 Miles Northeast Of Sprague. Contractor Crews Will Be Chip Sealing The Roadway. Anticipate Single Lane Closures With Flagging And/or Pilot Car During Construction. 7 A.m. To 5 P.m., Monday Thru Friday. Traffic
2024-09-28
Roadnow