Constructions near Junction at Prospect Street
2025-08-02
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPPaving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open
Paving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open
Start Time: 2025-04-21T09:00:02.000-04:00
End Time: 2026-08-04T23:59:00.000-04:00
map local traffic