Constructions near Junction at Shirley Drive
2025-05-05
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPNYSDOT TMC - Albany: Construction , pothole repair on I-87 Northway southbound between Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) and ADIRONDACK NORTHWAY at US-20 (Guilderland) 1 Left lane of 3 lanes closed until 12:00 PM
NYSDOT TMC - Albany: Construction , pothole repair on I-87 Northway southbound between Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) and ADIRONDACK NORTHWAY at US-20 (Guilderland) 1 Left lane of 3 lanes closed until 12:00 PM
Start Time: 2025-01-27T09:15:00.000-05:00
End Time: 2025-05-05T08:04:56.330-04:00
map • local traffic - MAPRoadwork on Erie Blvd from NY-5/State St to Nott St.
Roadwork on Erie Blvd from NY-5/State St to Nott St.
Start Time: 2025-05-04T12:02:36.000-04:00
End Time: 2025-05-05T08:04:56.330-04:00
map • local traffic - MAPNYSDOT TMC - Albany: bridge work on RIVERVIEW RD both directions CLAM STEAM RD and BOYACK RD (Halfmoon) alternating lanes closed controlled by traffic signals, Continuous Wednesday January 15th, 2025 12:00 AM thru Friday December 19th, 2025 11:59 PM All lanes open
NYSDOT TMC - Albany: bridge work on RIVERVIEW RD both directions CLAM STEAM RD and BOYACK RD (Halfmoon) alternating lanes closed controlled by traffic signals, Continuous Wednesday January 15th, 2025 12:00 AM thru Friday December 19th, 2025 11:59 PM All lanes open
Start Time: 2025-05-03T20:01:00.000-04:00
End Time: 2025-05-05T23:59:59.000-04:00
map • local traffic - MAPRoadwork on NY-2 / Troy Schenectady Rd from Swatling Rd (Troy Schenectady Rd/NY-2) to I-87/Adirondack Northway (Troy Schenectady Rd/NY-2).
Roadwork on NY-2 / Troy Schenectady Rd from Swatling Rd (Troy Schenectady Rd/NY-2) to I-87/Adirondack Northway (Troy Schenectady Rd/NY-2).
Start Time: 2025-04-29T10:38:35.000-04:00
End Time: 2025-05-05T08:04:56.330-04:00
map • local traffic - MAPNYSDOT TMC - Albany: bridge work on RIVERVIEW RD both directions CLAM STEAM RD and BOYACK RD (Halfmoon) alternating lanes closed controlled by traffic signals, Continuous Wednesday January 15th, 2025 12:00 AM thru Friday December 19th, 2025 11:59 PM All lanes open
NYSDOT TMC - Albany: bridge work on RIVERVIEW RD both directions CLAM STEAM RD and BOYACK RD (Halfmoon) alternating lanes closed controlled by traffic signals, Continuous Wednesday January 15th, 2025 12:00 AM thru Friday December 19th, 2025 11:59 PM All lanes open
Start Time: 2025-04-23T16:35:14.000-04:00
End Time: 2025-05-05T23:59:59.000-04:00
map • local traffic